Preparation for installation

Installation information

Recommendation: For substrates that are difficult to substrates, e.g. reinforced concrete and/or with and/or if the inclination cannot be realised during the drilling process, drill a DN 182 core hole and the wall sleeve DN 160 with styrofoam wedges to 1 to 2 % slope.

The condensate is drained via the external cover.

Recommendation: To prevent dirt from depositing on the façade around the external cover, fit a water-repellent plaster system.